Taj Ma-hen Weekend 4

March 19th, 2012

I quit about noon Sunday. I made some progress and the Taj Ma-hen will start looking much better soon.

I have to put up the molding and siding. I have to put up the roof and insulate the interior. If the weather holds out I will be doing siding for an hour after I get home from work this week. The siding goes slowly.

This weekend I want to finish the roof and put up the insulation.

After that I need to build doors, put up paneling on the inside to hold the insulation in. I hope to have the pen part built a little after the chicks arrive so I can put them out in the shed as soon as they can take the evening chill.

Chicks arrive the week of April second. April 7th and 8th I will be working on beehives because the bees arrive the morning of the 8th. April 14th and 15th should see the shed complete.